Asset Scheduling

Asset Scheduling

A request we hear often is the ability to flex assets in our out. Perhaps in the busy season an operator wants to bring on more assets to handle the demand. Or, maybe from time to time an asset needs to be down for maintenance. This wasn’t something TRYTN supported easily.

Starting today you can now set overrides for assets. Think of it as a schedule for assets at a higher level than an activity schedule. You can add additional or reduce assets for a date and time range and the system will automatically adjust the capacity available for all products that use those assets during that time frame. Best of all you can schedule multiple overrides (not overlapping) ahead of time and it just works.

bicycles
a woman sitting at a table using a laptop computer
Blog
Virginia

Seven Ideas for Slow Season

It’s hard to avoid having an “off-season” in any business. This is especially true in the tourism industry. By its very nature, the travel industry

Read More »

Request a Demonstration